Five Dead in Abuja Building Collapse as COREN Refers Consultant Engineer to Tribunal

A three-storey building under construction in Abuja gave way on the morning of Saturday, 16 May 2026, killing five people and trapping others under the rubble. Rescuers pulled 15 people from the rubble; nine were brought out alive, one of them in critical condition, according to figures reported by Channels Television. Dr Adedolapo Fasawe, the FCT Mandate Secretary for Health and Human Services, spoke on behalf of the rescue agencies. Other outlets reported slightly different numbers of survivors, a common pattern in the first hours of a collapse.

Within days, the first technical signal arrived. Preliminary findings by the Standards Organisation of Nigeria (SON) suggested that the developer may have compromised the quality of the cement mixture used in the structure. That finding was preliminary, and it matters for one reason: it pointed to materials, the most basic link in the safety chain.

On 15 October 2026, the Council for the Regulation of Engineering in Nigeria (COREN) took the matter a step further. At its 191st Ordinary Council Meeting in Abuja, the council approved its investigation report and referred Engr. Mustapha Maikaba, the project’s consultant engineer, to the COREN Engineering Tribunal. COREN records the site as Plot 481, Cadastral Zone B13, Gaduwa District, and says it acted on a petition and referral from the Department of Development Control of the Federal Capital Territory Administration (FCTA).

COREN’s investigative panel found a prima facie case against the engineer. The council was careful to state that this “does not amount to a final determination of guilt or professional liability”. The engineer can respond to the allegations, and the tribunal is expected to summon him.

For readers who build, buy or rent property, the sequence is instructive. A collapse is rarely a single failure. It is usually a chain: the materials, the design, the supervision and the approvals. Here, the first finding concerned materials, the later referral concerned professional responsibility, and the process was triggered by the very agency charged with development control. COREN also approved, at the same meeting, the final draft of the Harmonised National Construction Safety Guidelines for gazetting and distribution, a step the industry has long awaited.

Safetyview will continue to follow the tribunal process and report its outcome.

Sources: Channels Television (16 May 2026); Nigeria Housing Market on the COREN 191st Council Meeting (11 November 2026).

Leave a Reply

Your email address will not be published. Required fields are marked *